Strom Thurmond Power Plant

Owner: Army Corps of Engineers – Savannah District
General Contractor: NASCO
Electrical Contractor: Hammett Electrical Company, Inc
Seismic Engineers: Synergy Engineering
EDC Design Team Members: Michael Mongrue, Tom Brinson

Description: The project consisted of the replacement of the four high voltage circuits routed from the power plant’s transformer deck to the distribution yard. The original oil filled 115KV pipe system was removed and replaced with new cable tray and extruded dielectric enclosed 115KV cabling.